Maintenance in 2019/2020

In July 2020 the large-scale refit was completed with great satisfaction. For more than 8 months, the Clipper Stad Amsterdam stayed at Damen Shipyard in Den Helder where the maintenance with a focus on optimization and sustainability of the energy supply on board was done. 

To give you some idea: the two former generators have been replaced by smaller sets that are better suited in terms of power requirements. A new main engine has been installed equipped with an exhaust gas treatment installation to optimize efficiency and consumption and to meet future emission requirements. With the new wastewater treatment installation on the ship, future International Maritime Organisation requirements are met. The complete rigging, the engineering in the engine room, and the galley have also been renewed. The entire ship has been repainted as well.